No it is not correct that the road will be 1km wide.

All FMPs in Ontario are mandated by law to display a 500m buffer on each side of the proposed route, which is in effect makes a 1km wide corridor. There will likely be some variations off the centre line when the road right-of-way is actually harvested and the road is constructed, but the actual width of the road within the corridor should be detailed elsewhere in the FMP (and would normally be considerably less than 80m wide).

Author:  tearknee [ May 30th, 2018, 9:08 am ]
Post subject:  Re: Save Solace Wildlands Petition

The road corridor is 1 km wide. Not the road itself. That would be silly.

These details, including maps of the planned route are available on the campaign page.